Grading & Driveway Construction
Driveways and grading built to last in Ozarks weather.
A driveway you can drive on in February, after a 3-day rain, in a low-clearance car.
What's included
Scope, in plain language.
- Route layout and crown design
- Subgrade prep and compaction
- Geotextile fabric on soft spots
- 3" base rock + 2" surface gravel
- Culverts, ditches and side drainage
- Grading and crown to shed water
How we do it
No mystery. No surprises.
- 01
Walk the route
We find the high ground, the springs, and the spots that'll wash if you don't drain them. We talk about budget vs. forever.
- 02
Cut and shape
Box-blade or dozer to shape the subgrade with a 4–6% crown so water sheds.
- 03
Drain it
Culverts under low spots, side ditches where the slope demands it. Most driveway failures are drainage failures.
- 04
Lay the rock
Base rock first, compacted in lifts. Top with surface gravel. We use 1" minus or 3/4" clean depending on the application.
What it costs
$8 – $18 per linear foot for typical 12-ft wide gravel drives. New drives over 1,000 ft scale down per foot.
Every job is different. Below is what nudges your number up or down.
Drives the price up
- +Side-hill cuts and switchbacks
- +Multiple culverts
- +Hauling rock from far quarry
- +Soft subgrade requiring fabric and extra base
Drives it down
- −Existing driveway just needing a refresh
- −Local quarry within 10 miles
- −Straight runs with good drainage already
FAQ
Frequently asked
We typically use 3" minus base topped with 1" minus surface gravel from local quarries. For a smoother finish or a horse-friendly surface, we'll use 3/4" clean limestone instead.
A properly built drive (compacted base, real crown, drained ditches) goes 7–10 years before it needs a meaningful refresh. A bulldozed-and-dumped drive goes 1–2 winters.
We do the dirt and rock. We work alongside paving contractors we trust if you want to pave the final surface.
Yes. That's a big chunk of what we do. Usually it's a drainage problem, not a rock problem. We diagnose, fix the drainage, and re-grade.
A typical 500-ft new driveway is 2–4 days. A re-grade and re-rock on an existing drive is often 1 day.
Yes. We set, backfill and grade culverts as part of most driveway jobs. We can also fix neighbor or county-road culverts.
A typical 500-ft new drive at the standard 12-ft width takes 2 to 4 days. We walk the route, cut and shape the subgrade, drain it, then lay rock. Side-hill cuts, switchbacks and multiple culverts add days.
Most driveway failures are drainage failures, not rock failures. If water runs down the drive instead of off it, the rock migrates and the subgrade turns soft. So we set the 4 to 6% crown, cut side ditches and place culverts under the low spots first. Rock goes on last, base compacted in lifts, surface gravel on top.
Often, yes. If the route works and the base is still there, a re-grade and re-rock is usually a one-day job and costs less than new construction. We build new when the route itself is the problem: bad grade, no place to shed water, or no usable base.
That range covers typical 12-ft wide gravel drives across the southern Missouri Ozarks. Price runs high with side-hill cuts, multiple culverts, soft subgrade needing fabric and extra base, and long rock hauls. It runs low on straight runs with good drainage, a quarry within 10 miles, or an existing drive that just needs a refresh. Drives over 1,000 ft scale down per foot.
No, and the difference is why drives fail. Driveway excavation is the dirt work underneath: walking the route, stripping topsoil and soft material, cutting and shaping the subgrade with a four to six percent crown, and setting culverts and side ditches so water leaves the drive. Only then does rock go on, base compacted in lifts with surface gravel on top. Dumping gravel on unprepared ground gets you one or two winters.
Where we do this work
Grading & Driveway Construction across the Ozarks.
We mobilize from Bruner to every city below. Tap your town for local context, drive time, and ground conditions.
Related services
Often paired with this work.
Get a free estimate
Tell us about your project.
Last week we cleared 14 acres in Ava and rebuilt a pond dam in Mansfield. Yours next?
Most calls get a same- or next-business-day reply. Free estimate. No pressure.
Get a free estimate
Step 2 of 5We'll call you within 1 business day.